Kajima Projects - Industrial Facilities
2004Bridgestone / Poznań
Extension and renovation of the company’s Poznań tyre factory
Client: Bridgestone Poland Sp. z o.o.
Total Floor area: 20 700 sq m
2004Parker Hannifin / Siechnice
Hydraulic connector plant in Siechnice
Client: Parker Hannifin Sp. z o.o.
Total floor area: 12 680 sq m
Building named LOWER SILESIAN CONSTRUCTION OF 2003-2004 in a competition organised
by the Polish Association of Building Engineers and Technicians
2005Haerter / Legnica
Metal components plant in Legnica Special Economic Zone
Client: Haerter Technika Wytłaczania Sp. z o.o. Sp. K.
Total floor area: 3 900 sq m
2005Nutricia / Opole

Extension and renovation of the company’s Opole food additive factory
Client: Nutricia Sp. z o.o.

Area: 11 400 sq m

2005Sanden Manufacturing / Polkowice
Car air-conditioning compressor plant in Polkowice
Client: Sanden Manufacturing Poland Sp. z o.o.
Area: 27 000 sq m
2006Saint Gobain / Dąbrowa Górnicza
car-glass assembly plant in Dąbrowa Górnicza
Client: Saint Gobain Sekurit HanGlas Sp. z o.o.
Total floor area: 20 236 sq m
2006Electrolux / Oława
Washing machine plant in Oława
Client: Electrolux Poland Sp. z o.o.
Total floor area: 48 870 sq m
Building awarded in SAFE CONSTRUCTION 2005 by the State Labour Inspectorate in Wrocław
2006Electrolux / Świdnica
Cooker plant in Świdnica
Client: Electrolux Poland Sp. z o.o.
Total floor area: 30 262 sq m
Building awarded in SAFE CONSTRUCTION 2006 by the State Labour Inspectorate in Wrocław
2006Johnson Controls / Siemianowice Śląskie
Car-seat component plant in Sieniamowice Śląskie
Client: Johnson Controls Siemianowice Sp. z o.o.
Total floor area: 20 445 sq m
2007Haerter / Legnica
Extension of the small metal components plant in Legnica
Client: Haerter Technika Wytłaczania Sp. z o.o. Sp. K.
Total floor area: 5 100 sq m
2007Electrolux / Oława
Extension of washing machine plant in Oława
Client: Electrolux Poland Sp. z o.o.
Total floor area: 16 800 sq m
2008GMMP Sp. z o.o. / Gliwice
Extension of existing Opel car plant in Gliwice
Client: General Motors Manufacturing Poland Sp. z o.o.
Total Floor area: 7 400 sqm
2008T.E.E.M. / Wałbrzych
Die maintenance shop in Wałbrzych
Client: Toyota Europe Engineering & Maintenance NV/SA
A Total floor area: 2 570 sq m
2009Cadbury Wedel / Bielany Wrocławskie

Extension of existing factory in Bielany Wrocławskie
Client: Cadbury Wedel Sp. z o.o.
Total floor area: 13862,55 sqm

Building awarded in SAFE CONSTRUCTION 2008 by the State Labour Inspectorate in Wrocław