2004Warehouse for Toyota Tsusho / Wałbrzych
Client: Toyota Tsusho Europe S.A.
Completed: 2004
Scope of work: General Contracting, Building Permit Design, Execution Design
Location: Wałbrzych, 5 Jachimowicza St. (Wałbrzych Special Economic Zone)
Plot area: 31,420 m2
Total area: 5,237 m2
Author of design: Krzysztof Tetera (TKS Polska)
Description: storage hall with office-social area, for Toyota Tsusho Europe S.A.
References.
2004Storage hall No. A2 / Mszczonów
Client: Europa Distribution Center Sp. z o.o.
Completed: 2003-2004
Scope of work: General contracting – full scope, Execution Design
Location: Mszczonów, Tarczyńska St. (in the logistic centre EUROPA PARK in Mszczonów)
Plot area: 28’221 m2
Footprint area (warehouse and offices): 13,377 m2
Author of design: SAMI Architekci Sp. z o.o.
Description: Storage hall A2 consisting of a warehouse part and an office-social area. The warehouse is made from a steel structure and light housing. Adjacent to the hall, the two-story office building is made from masonry construction. It has a varied façade made of stone linings and elevation steel plates.
References.
2004MCTI / Błonie
Renovation of Błonie warehouse
Client: MCTI Polska Sp.zo.o.
2007Storage hall No. A2 / Wola Bykowska
Client: Poland Central Unit 1 Sp. z o.o. (company from Europolis group)
Completed: 2007
Scope of work: General contracting – full scope, implementation and modification of road intersection (road no DK91), Changed Building Permit Design, Execution Design and Design of changes of traffic
Location: Wola Bykowska (near Piotrków Trybunalski), Grabica 97 (in Europolis Park Poland Central)
Plot area 90,438 m2
Total area: 43,580 m2
References.
2007Storage hall No. A3 / Wola Bykowska
Client: Poland Central Unit 1 Sp. z o.o. (company from Europolis group)
Completed: 2007-2008
Scope of work: General contracting – full scope, Changed Building Permit Design, Execution Design
Location: Wola Bykowska (near Piotrków Trybunalski), 97 Grabica St. (in Europolis Park Poland Central)
Plot area: 61,590 m2
Total area: 32,500 m2
Total area of all retention tanks: 18,000 m2
References.
2008Reynaers / Piaseczno
Client: Reynaers Polska Sp. z o.o.
Completed: 2007-2008
Scope of work: General contracting of civil and M&E works, Execution Design
Location: Piaseczno (near Warsaw) 12 Okulickiego St.
Area designated for expansion: circa 11,000 m2
Total area (warehouse, office): 6,517 m2
Description: Development of the existing Reynaers storage hall on a steel structure and light construction, as well as based on corporate guidelines concerning the hall finishing standard, as well as equipment and colour scheme.
References.
2009Storage hall No. 11 / Błonie
Client: Europolis Alliance Logistic Center 1 Sp. z. o.o.
Completed: 2009
Scope of work: General Contracting, Changed Building Permit Design, Execution Design
Location: Błonie, near Warsaw, Pass 20 O (in Europolis Park Błonie)
Plot area: 63,000 m2  (for halls No. 11 and 12)
Total area: 17,849 m2
Description: warehouse no 11 of high storage in light casing technology.
2009Frigo Logistics / Radomsko
Client: Frigo Logistic Sp.z o.o.
Completed: 2008-2009
Scope of work: General contracting including refrigeration technology and racks equipped, Building Permit Design, Execution Design
Location: Radomsko, 3 Przedsiębiorców St.
Plot area:  50,680 m2
Total building area: 14,000 m2
Description: The Frigo Logistics deep freezer consists of four major functional parts. The first two are: a food deep freezer high storage hall (with an interior temperature up to -24 °C) and the dispatch hall (with an interior temperature of at least 0,4 °C), both interconnected with a system of sliding walls and evacuation doors. The site also has a developed technical sector and a two-story office area. The deep freezer is equipped with decompression valves, balancing the pressure between the environment and the interior of the chamber on a current basis.
2009Storage hall No. 12 / Błonie
Client: Europolis Alliance Logistic Center 1 Sp. z. o.o.
Completed: 2008-2009
Scope of work: General Contracting, Changed Building Permit Design, Execution Design
Location: Błonie, near Warsaw, Pass 20 O (in ,,Europolis Park Błonie”)
Plot area: 63,000 m2  (for halls No. 11 and 12)
Total area: 20,816 m2
Retention tank area:  953 m2
Description: warehouse no 12 of high storage in light casing technology.
2012Hala magazynowa / Łódź
Klient: PLC Poland 13 Sp. z o.o., Como Development 10 Sp. z o.o. (spółki z grupy Panattoni Europe)
Realizacja: 2012
Zakres prac: Generalne Wykonawstwo - pełen zakres, Projekt Wykonawczy
Lokalizacja: Łódź, ul. Zakładowa 90/104
Powierzchnia całkowita: łącznie 26’000 m2
Opis: Realizacja nowej hali wysokiego składowania dla Media Expert z częścią biurowo-socjalną oraz rozbudowa istniejącej hali dla RRD i Röhlig Suus Logistic.
2012Warehouse hall / Łódź
Client: PLC Poland 13 Sp. z o.o., Como Development 10 Sp. z o.o. (company from Panattoni Europe group)
Completed: 2012
Scope of work: General contracting – full scope, Execution Design
Location: Łódź, 90/104 Zakładowa St.
Total area: 26,000 m2
Description: The implementation of a new warehouse of high storage with an office-social area, for Media Expert; expansion of the existing warehouse for RRD and Röhlig Suss Logistic.
2013U.O.S. base / Łowicz
Client: United Oilfield Services Sp. z o.o.
Completed: 2012-2013
Scope of work: General contracting – full scope
Location: Łowicz, Ekonomiczna St.
Plot area: 124,458 m2
Footprint area: 8,840 m2
Pavements: circa 80,000 m2
Description: Hardware-transportation base for United Oilfield Service, assigned for storage and handling of heavy equipment used for seismic surveys and the exploitation of shale gas deposits.