The extension of the Electrolux Poland washing machine manufacturing plant by an additional manufacturing and assembly part (16,000 m² in total), staff and technical part (767 m² in total), new waste shed (450 m²) and the necessary underground and road infrastructure. Due to the mounted overhead crane with a lifting capacity of 125 kN, the structure and foundations of the new part of the hall have been adequately reinforced. The extrusion presses installed in the hall required the construction of special separate foundations. Kajima also made access ways to the process systems.

Electrolux (ext.), Oława

Client: Electrolux Poland
Execution period: 2006-2007
Scope of work: execution design, general contracting
Location: Oława, Ofiar Katynia 5 St,
Total area: 16,767 m²